TM 10-4610-310-14
0006 00
WARNING
Maintain control of equipment while moving down the ramp. Do not place yourself in front
of 3kW TQG set when traveling down the ramp. Personnel should assist unloading.
Serious injury to personnel could result.
Unload 3kW TQG set and place to the rear of the high-pressure pump module.
6.
a. Employ three personnel for this task.
b. Tilt the hand truck on to its wheels. Only one man will be pushing the TQG down the ramp.
c.
Assist the unloading of the TQG by having the two remaining personnel holding the handles on
the TQG while standing on each side of the ramp.
d. Allow the TQG to slowly roll down the ramp.
e. Push the TQG to desired location. Ensure that gauges are facing the rest of the LWP system.
Remove tie-down strap and hand truck.
7.
Make sure the 3kW TQG set is level and ready for operation. See TM 9-6115-639-13 for instructions.
8.
Store hand truck and tie down strap in the appropriate location.
9.
10. Remove the ramp from vehicle tailgate.
11. Fold the ramp and store in the appropriate location.
END OF WORK PACKAGE
0006 00-11 / 12 blank