TM 10-4610-310-14
0022 00
SECOND PASS SETUP AND OPERATING PROCEDURE - continued
12. When the product TDS is less than 1 mg/liter and the chlorine residual is at least 2 mg/liter, open ball valve
V49 on the inlet spool piece of the product tank.
13. Attach the 10-ft long, 1-inch diameter potable water hose (white) to the inlet spool piece located on the
product water tank T3.
14. Distribution of the second pass product water is the same as normal product water distribution.
END OF MISSION DECONTAMINATION PROCEDURES
1. After treating waters contaminated with radioactive iodide, cyanide or arsenic, decontaminate the LWP
as if it has been contaminated with only radiological agents.
2. Residual arsenic and cyanide are both highly soluble and should be easily flushed from the system with
water. It is not necessary to dispose of gaskets, hoses, and tubing.
3. See WP 0016 and FM 3-5 for additional decontamination instructions and guidance.
END OF WORK PACKAGE
0022 00-7 / 8 blank