SECOND PASS SETUP AND OPERATING PROCEDURE - continued
Figure 2. Layout for the Second Pass.
3. Leave the 10-ft long, 1-inch diameter potable water hose (white) disconnected from the inlet spool piece of
the product tank until the unit is in full operation and product water TDS and chlorine have been verified with
the handheld meters.
4. Disconnect the fabric hose (green) from the UF module feed inlet. Connect the booster pump discharge
hose (green) to the UF module feed inlet.
5. Open settling tank outlet valve V48 on the settling tank T1 outlet spool piece.
6. Drape the outlet end of the UF reject hose into the settling tank. Drain the hose before connection.