TM 5-3800-205-10-2
MARINE TRANSPORT--ROLL-ON/ROLL-OFF (RO/RO) PROCEDURES - CONTINUED
0019 00
RO/RO PROCEDURES - CONTINUED
3.
Raise or lower water distributor tank as required to clear the crest of ramps.
4.
After loading, park machine where directed to do so:
a.
Place transmission in N (Neutral) and lock.
b.
Apply parking brake.
c.
Lower tank and position front edge of tank onto suitable shoring.
d.
Shut down engine and secure machine against vandalism.
e.
Fold side mirror inward.
5.
Provide assistance, as required, to ship's crew in blocking/shoring/lashing machine for transport.
6.
After transport:
a.
Fold side mirror outward.
b.
Remove vandalism guards and start engine.
c.
Raise tank.
d.
Release parking brake.
END OF WORK PACKAGE
0019 00-2