TM 5-3800-205-10-2
RAIL TRANSPORT - CONTINUED
0020 00
CONFIGURE MACHINE FOR RAIL TRANSPORT
NOTE
To facilitate machine disassembly and sectionalization, it is crucial that machine be positioned on level
ground, with tractor and water distributor aligned and steering centered.
If possible, position machine in direction of helicopter's takeoff, so that pilot does not have to pick up
load, then turn aircraft into takeoff direction.
When hydraulic hose guide disconnects need to be disconnected, operate control levers through all posi-
tions (WP 0004 00) to relieve any trapped hydraulic pressure in hoses. This will facilitate disconnection
of hoses.
1.
Position water distributor on level ground, in railhead staging area and in line with railhead. Ensure tractor and water
distributor are aligned and steering wheel is centered.
2.
Place ISU-60 container in railhead staging area and remove the following items from container:
a.
toolbox;
b.
exhaust extension (OCONUS ONLY); and
c.
four steering locking collar assemblies, two short (6 5/8 in.) and two long (10 3/4 in.).
STEERING CYLINDER
LOCKING COLLAR ASSEMBLIES
EXTENSION
TOOLBOX
390-1119
0020 00-4