TM 5-3800-205-10-2
RAIL TRANSPORT - CONTINUED
0020 00
TOOLS AND EQUIPMENT
1.
Tools and equipment required to prepare the machine for rail transport are stored in an ISU-60 shipping and storage con-
2.
Components of the machine that must be removed in preparation for rail transport are stowed in the ISU-60 container or
in the BII toolbox on the rear deck of the water distributor.
3.
Reinstall mounting hardware for all removed components on machine, to secure against loss during transport.
4.
Once the machine has been loaded onto the flatcar, the ISU-60 container is also loaded onto flatcar.
SUMMARY OF PROCEDURES--RAIL TRANSPORT (CONUS)
NOTE
The following summary of procedures is provided to assist personnel preparing the machine for CONUS rail
transport.
1.
Load machine onto flatcar.
2.
Secure machine on flatcar:
a.
Install steering locks.
b.
Provide blocking, shoring, wind protection safeguards, and vandalism protection. Tie down machine.
c.
Pack ISU-60 container and load on flatcar. Tie down container.
3.
The following illustration shows the water distributor prepared for CONUS rail transport.
CONUS RAIL
0020 00-2