TM 10-4610-229-24
Table 2-1. Preventive Maintenance Checks and Services - Continued
Q - Quarterly
S - Semi-Annually
INTERVAL
ITEM
ITEM TO BE INSPECTED
NO.
Q
S
PROCEDURE
High Pressure Pump Assembly (Cont)
42
Batteries. Service batteries. (See TM 9-6140-200-14.)
43
Instrument Panel. Check gages for damage and proper
operation. Replace as required (para 2-79).
44
Wiring Harness. Check wires for damage and loose
connections. Tighten or replace as required (para
2-80).
NOTE
If pump is in continuous operation, adjust belts weekly.
45
V-Belts. Check belts for wear, cracks, and proper
adjustment. Adjust or replace as required (para 2-81).
46
Pillow Block Assembly. Check for cracks and loose
mounting hardware. Tighten loose mounting hardware.
Replace assembly as required (para 2-82).
47
Diesel Engine. Check throttle and emergency shutoff
cord for proper operation. Repair as required (para
2-87). Check for loose mounting hardware. Tighten as
required.
48
Air Cleaner. Inspect air cleaner and hose for proper
installation, cracks, breaks, and loose connections.
Replace or repair as required (para 2-84).
49
Muffler Assembly. Check mounting hardware for
tightness. Tighten as required. Check muffler for
cracks and leaks. Replace as required (para 2-85).
50
Turbocharger. Check mounting hardware for tightness.
Tighten as required. Check for cracks and leaks.
Replace as required (para 2-86).
51
Nozzle Holder. Check for loose mounting hardware and
leaks. Tighten loose mounting hardware.
2-7