TM 10-4610-229-24
3-61. VALVE GROUP REPAIR (CONT)
8 Starting with center rocker arm bolt, torque bolts to 180-220 ft lb.
9 Starting with center rocker arm bolt, retorque bolts to 315-330 ft lb.
10
Remove protective covers from fuel lines.
11
Install fuel lines. Install line nuts and torque to 25-30 ft lb.
12
Adjust valves (para 2-104).
13
Install valve covers (para 2-103).
3-62. VALVE REPLACEMENT/REPAIR
This task covers:
a.
Removal
c.
Installation
b.
Repair
INITIAL SETUP
Use With
Supplies
High Pressure Pump Assembly
Oil, item 24, appendix C
Tags, item 34, appendix C
Tools
Equipment
General Mechanic's Automotive
Condition
Tool Kit, item 10, appendix B
Para
Condition Description
Basic Field Maintenance
Automotive Maintenance and
3-64
Cylinder head removed.
Repair Shop Equipment, item 20,
appendix B
Spring Tester, item 62,
appendix B
3-164