Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
TIMING GEAR COVER REPLACEMENT(CONT) - TM-10-4610-229-24_492
TIMING GEAR GROUP REPLACEMENT
TM-10-4610-229-24 Water Purification Unit Reverse Osmosis 150 000 GPD Skid-Mounted PD81146 (4610-01-121-0161) Manual
Page Navigation
482
483
484
485
486
487
488
489
490
491
492
TM 10-4610-229-24
3-67. TIMING GEAR COVER REPLACEMENT (CONT)
5
Install support bracket and four bolts.
6
Install small cover and bolts.
7
Install back cover and bolts.
8
Install oil pressure line. Tighten line nut.
9
Install oil pan (para 2-105).
10
Install vibration damper and pulley (para 3-73).
11
Install
alternator
(para 2-52).
12
Install water pump (para 2-99).
13
Install expansion tank (para 2-98).
14
Install engine and supports (para 2-83).
3-68. TIMING GEAR GROUP REPLACEMENT
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
:
Use
With
Supplies
High Pressure
Pump Assembly
Heat chalk, 600°F, item 21,
appendix C
Tools
Equipment
General Mechanic's Automotive
Condition
Tool Kit, item 10, appendix B
ParaCondition
Description
Common No. 1 Organizational
Maintenance Automotive
3-67
Timing gear cover
Maintenance and Repair Shop
removed.
Equipment, item 11, appendix B
3-54
Injection pump removed.
2-104
No. 1 cylinder set to
top dead center (tdc)
3-176
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business