ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0028 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
5. Place the cyclone separator unit on the floor with the separator facing up (see Figure 17). Slide it
back and to the right as far as possible.
CAUTION
When packing the items in the following step, be careful not to damage the tubing,
wires, or sensors mounted behind the NBC tank.
6. Place as many of the following hoses as you can behind the NBC tank (see Figure 17):
2-in x 50-ft. discharge hose (1 each)
3-in x 10-ft. discharge hoses (2 each)
2-in x 50-ft. discharge hoses (4 each)
2-in x 65-ft. discharge hose (4 each)
7. Place additional discharge hoses in front of the RO feed tank and to the left of the cyclone
separator assembly (see Figure 18).
WARNING
Three person lift. Three people are required to safely move the MF pump skid.
Use your legs, not your back. Failure to observe this warning may result in back
injury.
8.
Move the MF pump skid onto the TWPS skid (see Figure 18).
9.
Position the pump end inside the mounting brackets and install the retaining rod.
10.
Place Adaptor A-09 inside the MF pump skid.
11.
Place the bisulfite and citric acid chemical buckets between the MF pump skid and the NBC tank.
MOUNTING BRACKET
DISCHARGE HOSES
MF PUMP SKID
ADAPTOR A09
CHEMICAL BUCKETS (2)
RETAINING ROD
Figure 18. Equipment Area Packout 2.
12. Place any remaining discharge hoses on top of the chemical buckets and cyclone separator.
0028 00-29