ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0028 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
13. Hang the right hot air plenum in the deployment straps (see Figure 19).
14. Pack the following items in the order listed (see Figure 19):
3000-gallon distribution tank
3000-gallon distribution tank
1500-gallon cleaning waste tank
Tripod assembly
5/8-in. x 50-ft. auxiliary hose assembly P06
Motor-driven pump power cables
15. Attach a 10-ft. ratchet strap from the TWPS frame, over the 1500-gallon tank to the HPP frame.
16. Attach a 10-ft. ratchet strap from the upper left TWPS frame to the HHP frame.
17. Attach a 10-ft. ratchet strap from the TWPS frame near the chemical pumps, over the 3000-gallon
18. Pack the following items in the open spaces under the high pressure pumps:
Ice intake strainer attached to adaptor A-13
Adaptor A-11
Ice auger and handle (secure to the HPP support frame with 18-in. hook and loop strap).
OISS tee (secure to the HPP pump support frame with two 36-in. hook and loop straps:
one through the straight part of the tee and one around the tee female connector).
Operator station entry overhead support beam.
TRIPOD
RIGHT HOT
AIR PLENUM
AUXILIARY HOSE
POWER CABLES
3000-GAL TANKS
1500-GAL CLEANING WASTE TANK
10-FT.
RATCHET
OPERATOR STATION
STRAP
SUPPORT BEAM
ADAPTOR A-13
OISS TEE
RETAINING ROD
NBC TANK
MF PUMP SKID
ICE INTAKE STRAINER
ADAPTOR A-09
10-FT. RATCHET STRAPS
ADAPTOR A-11
ICE AUGER AND HANDLE
Figure 19. Equipment Area Packout 3.
0028 00-30