TM 10-4610-310-14
0009 00
SETUP - continued
Table 2. Control Module Electrical Connections.
CABLE NO.
CONTROL MODULE
DESCRIPTION
LABEL
CONNECTION
COLOR
1
J1
3kW TQG Set
White
2
J2
Raw Water Service Pump
Blue
3
J3
Booster Service Pump
Green
4
J4
Backwash Service Pump
Yellow
5
J5
Distribution Service Pump
Red
6
J6
Ultrafiltration Module
Gray
7
J7
High-Pressure Pump Module
Orange
8
J8
Chemical Injection/Cleaning Module
Purple
9
J9
Heater
Brown
NOTE
Connect the elbow plug on the service pump and straight plug on the control module when connecting the
service pump cables. The pump junction on the control module is labeled for the respective pump. All four
cables are interchangeable if necessary.
6. Connect the other end of the fabric hose (green) to the feed inlet Ultrafiltration (UF) module. If needed, use
the last section of fabric hose (green) to reach the UF module. See Figure 4.
7. Connect the cable P3 (green) elbow plug to the booster pump receptacle.
8. Ensure that the booster pump switch is in OFF and connect the straight plug of cable P3 to the control
module connection (J3). See Table 2.
BACKWASH
UF REJECT
INLET (P)
(K)
UF INLET (H)
Figure 4. UF Module Connection.