TM 10-4610-310-14
0084 00
SERVICE UPON RECEIPT - continued
Figure 2. Triple Shipping and Storage Container (TRICON).
Checking Unloaded Equipment
Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the
damage according to the instructions of DA PAM 738-750.
Make sure the equipment reflects the packing slip to see if the shipment is complete. Report all discrepancies
according to the instructions of DA PAM 738-750.
Setup Instructions
UF MODULE
HIGH-PRESSURE
PUMP MODULE
SETTLING
TANK
CONTROL
MODULE
CHEMICAL MODULE
PRODUCT TANK
RO ELEMENT MODULE
Figure 3. Field Setup.