TM 10-4610-229-24
3-69. POWER TAKEOFF REPAIR (CONT)
NOTE
Dust lip of oil seal should face forward.
29 Press oil seal into carrier from front. Press until seal casement is flush with front surface around bore.
30
Lubricate rubber oil seal. Install seal on bearing carrier.
31
Position bearing carrier with attached parts in power takeoff housing.
32
Install six bolts. Torque to 38-42 ft lb.
33
Install drive spider woodruff key.
34
Install drive spider, retainer washer, and lock plate.
35
Install three bolts. Torque to 177-195 ft lb.
36
Bend lock plate tabs against flat sides of bolts.
37
Install rubber blocks (if removed).
38
Install driving ring on flywheel. Install bolts.
39
Install dipstick.
3-70. FLYWHEEL REPLACEMENT
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP:
Use With
Equipment
Condition
High Pressure Pump Assembly
Para
Condition Description
Tools
3-69 Power takeoff removed.
General Mechanic's Automotive
Tool Kit, item 10, appendix B
Common No. 1 Organizational
Maintenance Automotive
Maintenance and Repair Shop
Equipment, item 11, appendix B
Lifting device, item 13,
appendix B
Sling, item 15, appendix B
3-183