ARMY TM 10-4610-309-14
MARINE CORPS TM10802A-14/1
0007 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
PREPARATION FOR USE AND INSTALLATION INSTRUCTIONS
SET-UP OPERATION UNDER USUAL CONDITIONS
i.
Connect the female-female 2 in x 5 ft., blue-banded suction hose to the remaining
Adaptor A-07 connection and to the suction inlet of Product Water Distribution Pump P-7.
Move the pump as needed to connect to the hose.
j. Connect the pump outlet tee Adaptor A-08 to the discharge outlet of the product water
distribution pump.
k. Connect one 2 in. x 65 ft., blue-banded product water distribution hose to each end of the
straight section of Adaptor A-08. (A 5/8-in. x 50 ft. auxiliary hose and Valve V-522 may
be connected in place of a distribution hose and nozzle for certain cleaning operations.)
l. Connect a dispensing nozzle to the end of both of the product water distribution hoses.
m. Lay the dispensing nozzles on top of the pump frame. Do not leave them on the ground.
3. Connect the Motor-Driven Product Water Distribution Pump P-7 electrical power cable as follows:
WARNING
Electrical hazard. The TWPS operates on 416 volts AC. Make sure Product Water
Distribution Pump P-7 is shut off (push the distribution pump STOP button on the
OCP) and then that the panel cover is closed and secured. Connect the power
cable to the P-7 pump skid before connecting it to the PDP power outlet. Failure to
observe this warning may result in serious injury or death from electrocution.
CAUTION
Connector damage or poor electrical connection. Use the fine brush from the tool
box to clean dust and sand out of connectors, terminals and dust caps before
making or capping a connection. Install the dust cap provided with connectors
and terminals whenever a connector is disconnected from its terminal. Failure to
observe this caution may result in connector damage or a poor electrical
connection.
a. Make sure that Distribution Pump P-7 is shut off (push the distribution pump STOP button
on the PDP).
b. Close and secure the OCP cover.
c. Uncoil the electrical power cable for Motor-Driven Distribution Pump P-7.
d. Connect the power cable to the P-7 skid junction box.
e. Connect the power cable to the P-7 power source connector at the PDP.
f. Open the OCP cover and continue with start-up and normal operation.
PRE-OPERATIONAL CHECKS
Before starting the TWPS to begin producing potable water, perform the following checks:
1. Check all hose couplings and verify that the camlock connectors are locked in place.
2. Check that the ground rod has been installed and that the ground connections are tight at both
ends.
3. Check that all raw water, MF feed pump, and product water distribution pump power cables are
properly connected.
0007 00-18