ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0028 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
12. Place the cargo net over the items in the generator area and tie it in place (see Figure 25).
13. At the front of the flat rack, attach the long section of a 20-ft. ratchet strap to each of the four tie-
down rings. Run the straps over the cargo net and connect them to the four short strap sections
positioned earlier on the rings at the back of the flat rack generator area.
14. Attach a 20-ft. ratchet strap to each of the two rings on the side of the generator. Run these
straps diagonally across the top of the cargo net to the inside tie-down rings at the front and rear
of the flat rack.
SIDE VIEW
FRONT VIEW
REAR VIEW
Figure 25. Cargo Net and Strap Placement.
Flat Rack Closure
1. Inspect the entire deployment area to make sure no items have been overlooked. Inspect the
skid to be sure all the packout straps are tight and all retaining rods and pins are in place.
WARNING
Potential for head and eye injury. Make sure that two people are holding up the
hinged top panel before removing the retaining pins from the top panel supports.
Failure to observe this warning could result in the top panel falling down suddenly,
resulting in head injury or the possibility of a top panel latch causing eye injury.
2. While two people hold up the hinged top panel, the third person removes the retaining pins from
the top panel supports (see Figure 26).
3. Carefully lower the top panel and latch it shut. Insert and secure the two retaining pins to an
accessible part of the supports.
0028 00-36