ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0028 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
10. From the front, pack the following items as shown (see Figure 23):
Fuel tank assembly (for one of the diesel-driven pumps)
50.5-ft. hose heating blankets F03-1 and F03-2
50-FT HOSE HEATING BLANKETS
FUEL TANK ASSEMBLY
66-FT HOSE HEATING BLANKET
DIESEL-FIRED HEATER
DIESEL PUMP SKIDS (2)
SOCKET WRENCH
PINCH BAR
TIE-DOWN RINGS
WARNING
Fall hazard. Make sure that flat rack rear panel #5 is fully latched in place before
using the folding steps to climb onto the roof. Failure to observe this warning
could result in personal injury.
0028 00-34