TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
WARNING
Two person lift. Two people are required to safely move the flat rack panels. Lift
with your legs, not your back. Failure to observe this warning may result in
personal injury.
2. Install flat rack panel #5 on the back of the TPWS and panels #6 and #7 at the generator end and
latch them in place (see Figure 22).
WARNING
Three person lift. Three people are required to safely move the diesel pump skids
and the diesel-fired heater. Use your legs, not your back. Failure to observe this
warning may result in back injury.
7
6
5
4
3
Figure 22. Flat Rack Panel #5, #6, and #7 Installation.
3. Pack the two diesel pump skids (with the fuel tank assemblies removed) and the diesel-fired
heater next to the generator (see Figure 23).
4. Strap the pinch bar to the front diesel pump skid using two 18-in. hook and loop straps (see
Figure 23).
5. Strap the bail bar socket wrench to the top of the front diesel pump skid using two 18-in. hook and
loop straps (see Figure 23).
6. Pack a 3000-gallon tank behind the diesel pump skids (see Figure 24).
7. Attach the short end of a 20-ft. ratchet strap to each of the four tie-down rings at the rear of the
8. Run a 10-ft. ratchet strap from the front left tie-down ring, through both pump skid frames, and
over the 3000-gallon tank to the corresponding ring at the rear.
9. Run a second 10-ft. strap from the next tie-down ring to the right, through the lower part of the
heater frame, and over the 3000 gallon-tank to the corresponding ring at the rear.
0028 00-33