TM 10-4610-310-14
0007 00
LOADING THE TRICON continued
25. Place the CWK box 3 on top of the CWK 2 box and secure with strap (6).
26. Place three grounding rod sections in available space.
27. Make sure the tie-down straps that secure the modules, 3kW TQG set, BII and COEI boxes, cold weather
boxes, cables box, and hoses to the floor and sides in D-rings and tie-down rings on TRICON are snug.
28. Install blocking and bracing materials to secure skids and accessories from shifting during transport, if
necessary. See FM55-80 for materials and instructions.
29. Close and secure doors on TRICON.
UNLOADING TRICON
1. Open both doors on TRICON.
2. Remove blocking and bracing materials, if necessary.
3. Remove tie-down straps from modules, 3kW TQG set, BII and COEI boxes, cold weather boxes, cables box,
foldable ramp, and hoses. Store in appropriate location until after the unloading.
4. Unload foldable ramp.
5. Unload BII, COEI, three cold weather kit boxes, and cables box from TRICON.
6. Load the 3kW TQG set on the hand truck. Secure with tie-down strap. See Figure 3.
7. Remove hoses and hand truck from TRICON. Never throw the hoses.
8. Remove 3kW TQG set from TRICON. Place in operational area.
9. Unload product tank and settling tank.
10. Remove lock pins from upper and lower service pump skids. Remove upper skid then lower skid from
TRICON.
11. Unload UF module. Position the module in the field setup. Place right side up. See WP 0006 00.
12. Unload control module.
13. Unload high-pressure pump module.
14. Unload chemical module from top of RO element module.
15. Unload RO element module.
16. Store tie-down straps, hand truck, ramp, and blocking/bracing material inside of TRICON.
17. Close and secure the doors.
TRICON MAINTENANCE
Maintain the TRICON according to TM 55-8145-203-13&P.
END OF WORK PACKAGE
0007 00- 7 / 8 blank