LOADING THE TRICON
WARNING
The five modules are to be lifted by at least four personnel. Do not attempt to lift any module
with less than four personnel. Injury to personnel and/or damage to equipment may result.
These instructions must be followed as outlined herein. Positioning of the equipment is critical for proper
transport and security.
1. A TRICON is used to ship the LWP.
2. Completely open both doors and secure. Make sure the D-rings and hold-down clips are not damaged or
missing.
3. The TRICON load plan is located in the storage box on the door of the TRICON.
4. Connect two straps (straps 1,and 2) to D-rings on the right side of the TRICON and lay them out for securing
the modules at a later time. See Figure 1.
5. Load the RO element module on the floor of TRICON. Position toward the rear on right side against the wall.
See Figure 1.
NOTE
Some module frames have alignment pins on top that fits inside hollow vertical legs. This
assists proper stacking and secure configuration.
CHEMICAL
MODULE
UF MODULE
HIGH PRESSURE
PUMP MODULE
RO MODULE
STRAP (1)
STRAP (2)
CONTROL
MODULE
Figure 1. Loading TRICON (First Phase).