TM 10-4610-310-14
0104 00
Chemical Tank Piping
1. Refer to Figure 4 for this procedure section.
2. Install piping (5) on bulkhead fitting (6).
3. Install valve (4) on the piping (5). Tighten union (9).
CAUTION
Install the retainer end of the y strainer in first. Damage to the strainer may result if installed backwards.
4. Install Y-strainer (10) if removed.
5. Install U-bolt (3) and secure with nuts (12) and washers (11).
6. Install male camlock (2) and dust cap (1) if removed.
Chlorine Tubing
Refer to Figure 6 for this procedure section.
Ensure that the inserts (10) are present on all the tubing ends.
Install anti-siphon valve (1) and if removed.
Install discharge tubing by connecting nuts (2) and (4).
Install suction tubing by connecting nuts (5) and (7).
Install spiral wrap (6) if removed.
Coagulant/Bisulfite Tubing
Refer to Figure 7 for this procedure section.
Ensure that the inserts (8) are present on all the tubing ends.
Install discharge tubing by connecting nuts (1) and (7).
Install suction tubing by connecting nuts (5) and (3).
Install spiral wrap (4) if removed.
Antiscalant Tubing
Refer to Figure 8 for this procedure section.
Ensure that the inserts (2) are present on all the tubing ends.
Install discharge tubing by connecting nuts (2) and (7).
Install suction tubing by connecting nuts (6) and (3).
Install spiral wrap (8) if removed.
Chemical Tank Tubing
Refer to Figure 9 for this procedure section.
Slide the tubing inside the tank. Ensure that the tubing is almost touching the bottom of the tank.
Secure tubing by tightening nuts (2) and (4).
END OF WORK PACKAGE
0104 00-9 / 10 blank