TM 10-4610-310-14
0109 00
DISASSEMBLY - continued
4. Remove four screws (4) from terminal box cover (6). See Figure 2.
5. Remove receptacle cap (2) with lanyard (7) from receptacle (3).
6. Remove terminal box cover (6) from terminal box with gasket (5).
7. Tag wires from receptacle (3) to assist during installation.
Figure 2. Service Pump Terminal Box (Exploded View).
8. Remove four screws (8) from receptacle (3) on terminal box cover (6).
9. Disconnect the quick connectors(9) from three wires (black, green, white) from the pump (5).
10. Remove receptacle (3).
11. Remove screw (1) and lanyard (7) in terminal box cover (6).
INSTALLATION
1. Connect three wires (black, green, white) to the pump by fitting the quick connectors (9) together.
2. Observe tags for correct wiring connections.
3. Install receptacle (3) on terminal box cover (6). Secure with four screws (8). Tighten securely. See Figure 2.
4. Install terminal box cover (6) on pump (5). Secure with four screws (4). Tighten securely.
5. Install screw (1) to secure lanyard (7) in terminal box cover (6). Tighten securely.
6. Reposition handle on base plate. Tighten two bolts securely. See Figure 1.
END OF WORK PACKAGE